Christies Beach WWTP
Project Details
Eptec was contracted to supply, install and weld HDPE (AKS) Linings for new activated sludge reactors and membrane tanks as part of the upgrade of the Christies Beach Wastewater Treatment Plant.
Eptec also carried out site jointing of FRP (fibreglass) pipework.
Description of Works
- Supply and installation of HDPE (AKS) membrane
- Site jointing of FRP pipework